Skip to content
Docs
Sign in

Methods: Auto, True shape, N-up, Strips

How each imposition method places pieces, what it is cut on, what it can't do, and the messages you may see.

The method decides how pieces may be cut apart, and so how they may sit on the sheet. Pick it in the run bar's Method list; Settings… next to it opens the settings of the method the run will use.

The run bar with the Method list, the Digital and Offset switch, Settings, Time and Run
The run bar: Method, Digital or Offset, Settings…, Time and Run
Method Use it when Needs
Auto you're not sure nothing
True shape pieces are shaped, or cut on a digital cutter nothing
N-up (guillotine) rectangles cut on a guillotine rectangles, sheets
Strips pieces are slit into strips, then trimmed sheets or a roll; mixed strips need rectangles and sheets

Auto#

Auto picks for you each time you run: N-up when every artwork is a rectangle and the job is on sheets, and True shape otherwise. A roll always nests true shape. Once a run has resolved it, the method list shows the choice, such as "Auto → N-up (guillotine)", and Settings… opens that method's settings.

True shape#

True shape nests every outline as it is, at the angles each artwork allows, on sheets or a roll. Pieces interlock, so it usually uses the least material. It suits digital cutters (knife, router or laser) that follow any path.

Jobs with many copies of a few artworks, such as sticker sheets, are laid out in repeating rows first; see Nesting. Smaller artworks are nested in the windows of larger ones (a frame, a ring, a tag with a cut-out); see Nesting. Its Settings…:

  • Nest parts in holes (on by default): fill the thru-cut holes of an artwork with smaller artworks of the job. Off, every artwork nests as its outline.
  • Smallest hole used (0.25 in, 6.35 mm): a hole takes pieces when a circle this wide fits inside its bleed.

Besides these, true shape follows the job's spacing, bleed, rotation and time. More time can find better solutions; the Compare tab lists every solution found. Rotation and time are on Nesting.

N-up (guillotine)#

N-up (step and repeat) lays rectangles out in rows and columns that a guillotine can cut: every cut runs straight across the pile. Each solution comes with a knife program, step by step (see The Production tab).

  • Rectangles only. A shaped artwork stops the run: "N-up needs rectangular pieces", followed by their names. Use True shape for those, or set their shape to Trim box or Custom size.
  • Sheets only. "N-up needs sheets" on a roll.
  • Quarter turns only. Pieces are placed at 0° or 90°. An artwork that allows no quarter turn is placed at 0°, and the run says so.
  • Several items are ganged on forms. A digital run may print each form a different number of times ("Form 2 × 84"), and the solution counts the pieces made by forms × copies.

The settings choose shared cuts or a gutter between pieces, the number of knife stages (2 to 4), whether to trade sheets for fewer knife strokes or fewer different sheets (forms), and the pile height the knife takes. See Settings reference.

Strips#

Strips keep pieces in straight strips between slit lines, for a slitter, a trimmer or a roll slitter. The viewer shows the slits as dashed lines, and the Production tab lists every strip.

  • One item per strip (the default): each strip holds a single item, and pieces keep their true shape inside it. Rectangles turn by quarter turns only.
  • Mixed strips hold different rectangles and are cut in two knife stages: strips, then pieces. They need sheets and rectangles ("Mixed strips need rectangular pieces", "Mixed strips need sheets"), choose their own direction, and take no gap, row, width or count limits yet.
  • Direction: on sheets, horizontal strips (slits run across the sheet) or vertical strips (slits run down it); on a roll, lanes down the roll (slit on a slitter) or bands across it (cut across). Auto tries both and keeps the better.
  • On a roll whose beds are kept (a cutter's beds, or a label press's frames), strips run in lanes only, and no piece crosses a bed: a lane stops at the end of each bed and goes on in the next. Bands would cross the beds, so Auto tries lanes only ("Strips keep pieces within beds in lanes only").

Lane changes#

On a roll in lanes, Lane changes (on by default) let a lane run one item, then the next, so the lanes finish together. Gap at a lane change is the space down the lane between one item and the next, for separator or changeover labels (empty: the gap between strips). With one row per strip (Rows per strip 1, one label across each lane), the lanes step down the roll at one pitch, the tallest item plus the spacing, so the rows line up across the web, and a lane change takes whole rows. A label job's lanes follow its Label lanes plan, row for row. This is lane ganging: three lanes can carry six items, and the roll is as short as the items allow. An item may continue at the top of the next lane. All lanes then share one width. On an open roll, a run with lane changes is kept only when it makes the roll shorter than one item per lane. Turn it off to keep each lane to one item: an item with more lanes is spread evenly over them, and the job needs at least as many lanes as items. A label job follows its Label lanes settings, with room for its changeover labels at each change, and a flexo repeat never changes lanes: its plates print the same thing for the whole run.

See Settings reference for the gap, rows, width and count limits.

Under a die#

When a job is planned on a standing die, the die's stations fix where every piece goes: the method doesn't apply and can't be changed. Under Compare or New die only, the method is labelled Method for new-die solutions: it lays out today's method and items without die lines. See Standing dies.

Changing method#

Changing the method doesn't make existing solutions out of date: a solution stays a valid imposition whatever method made it, and it still exports. Run again to get solutions made with the new method. See Run types: Digital and Offset for Digital and Offset.

Last updated Oct. 19, 2026